NASA Spacecraft Preparation

Images depict NASA technicians and spacecraft being prepared in clean rooms, showcasing advanced technology, equipment, and the intricate process of aerospace operations.

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, the P5 truss for mission STS-116 is lowered into the payload canister.  The canister will transport the truss to Launch Pad 39B where it will wait for installation in Space Shuttle Discoverys payload bay. The third port truss segment, the P5 will be attached to the P3/P4 truss on the International Space Station during the 11-day mission. The window for launch of mission STS-116 opens Dec. 7.
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the P5 truss for mission STS-116 is lowered into the payload canister. The canister will transport the truss to Launch Pad 39B where it will wait for installation in Space Shuttle Discoverys payload bay. The third port truss segment, the P5 will be attached to the P3/P4 truss on the International Space Station during the 11-day mission. The window for launch of mission STS-116 opens Dec. 7.