As the sky begins to lighten, the payload canister with the Multi-Purpose Logistics Module Leonardo inside begins moving up the Rotating Service Structure at Launch Pad 39B to the payload changeout room above. From there it will be transferred into Space Shuttle Discoverys payload bay. Leonardo, one of Italys major contributions to the International Space Station program, is a reusable logistics carrier. It is the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo is the primary payload on mission STS-102 and will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny. STS-102 is scheduled to launch March 8 at 6:45 a.m. EST

As the sky begins to lighten, the payload canister with the Multi-Purpose Logistics Module Leonardo inside begins moving up the Rotating Service Structure at Launch Pad 39B to the payload changeout room above. From there it will be transferred into Space Shuttle Discoverys payload bay. Leonardo, one of Italys major contributions to the International Space Station program, is a reusable logistics carrier. It is the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo is the primary payload on mission STS-102 and will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny. STS-102 is scheduled to launch March 8 at 6:45 a.m. EST
SuperStock offers millions of photos, videos, and stock assets to creatives around the world. This image of As the sky begins to lighten, the payload canister with the Multi-Purpose Logistics Module Leonardo inside begins moving up the Rotating Service Structure at Launch Pad 39B to the payload changeout room above. From there it will be transferred into Space Shuttle Discoverys payload bay. Leonardo, one of Italys major contributions to the International Space Station program, is a reusable logistics carrier. It is the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo is the primary payload on mission STS-102 and will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny. STS-102 is scheduled to launch March 8 at 6:45 a.m. EST by Piemags/PL Photography Limited is available for licensing today.
Royalty Free License
Royalty-Free Standard Commercial licenses are granted for worldwide, non-exclusive and perpetual use, unless specifically noted otherwise. All Royalty-Free transactions are final. The Royalty-Free Standard Commercial license has no limitations and covers up to 15 users.
  • $50.00 Low500 X 326
  • $150.00 Med750 X 489
  • $250.00 High2670 X 1740
  • Download your images from the download tab on this page after purchase.
  • Up to 5 downloads
  • Can be used for a year after purchase.
$1,225.00
RF High / Super Res 5 Pack
Save $25.00
$245.00
per download
Order a Framed Print
Looking for a license?
Click here, and we'll help you find it! Questions? Just ask!
DETAILS
Image Number: 6145-44519025Royalty FreeCredit Line:Piemags/PL Photography Limited/SuperStockCollection:PL Photography LimitedStory:Rocket Launch PreparationsContributor:PiemagsModel Release:NoProperty Release:NoResolution:2670×1740