Shawn Quinn, associate program manager for the Ground Systems Development and Operations Program (GSDO), signs the platform A North beam in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Kennedy's Engineering Directorate coordinated a platform beam signing event to celebrate the culmination of the NASA and contractor team's last several years of study, design, construction and installation of 20 new work platforms in High Bay 3 of the Vehicle Assembly (VAB). The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. GSDO, with support from the center's Engineering Directora

Shawn Quinn, associate program manager for the Ground Systems Development and Operations Program (GSDO), signs the platform A North beam in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Kennedy's Engineering Directorate coordinated a platform beam signing event to celebrate the culmination of the NASA and contractor team's last several years of study, design, construction and installation of 20 new work platforms in High Bay 3 of the Vehicle Assembly (VAB). The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. GSDO, with support from the center's Engineering Directora
SuperStock offers millions of photos, videos, and stock assets to creatives around the world. This image of Shawn Quinn, associate program manager for the Ground Systems Development and Operations Program (GSDO), signs the platform A North beam in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Kennedy's Engineering Directorate coordinated a platform beam signing event to celebrate the culmination of the NASA and contractor team's last several years of study, design, construction and installation of 20 new work platforms in High Bay 3 of the Vehicle Assembly (VAB). The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. GSDO, with support from the center's Engineering Directora by Piemags/PL Photography Limited is available for licensing today.
Image - Royalty Free Editorial
Royalty-Free Standard Editorial licenses are granted for worldwide, non-exclusive and perpetual NON-COMMERCIAL uses, unless specifically noted otherwise. All Royalty-Free transactions are final. The Royalty-Free Standard Editorial license has no limitations and covers up to 15 users.
  • $50.00 Low333 X 500
  • $150.00 Med500 X 750
  • $250.00 High3744 X 5616
Order a Framed Print
Looking for a license?
Click here, and we'll help you find it! Questions? Just ask!
DETAILS
Image Number: 6145-45124733Royalty FreeCredit Line:Piemags/PL Photography Limited/SuperStockCollection:PL Photography LimitedContributor:PiemagsModel Release:NoProperty Release:NoResolution:3744×5616