Rothschönberg, Röschenmundloch The Rothschönberger Stolln is a water solution tunnel of the Brander and Freiberg mining district. It was excavated from 1844 to 1882 and has a total length of 50.9 km with its ancillary facilities and is equipped with 8 light holes. The average gradient is 0.63 %. The clear width is 2.50 m, the clear height in the lower tunnel section (between Rothschönberg and the VII light hole) is 3.00 m and 1.50 m above the VII light hole. This means that the tunnel can be navigated by boat for inspection and maintenance purposes. The mouth, which allows the water to flow into the Triebisch, is located in the municipality of Klipphausen near the districts of Rothschönberg, Burkhardswalde and Munzig in the district of Meißen. The water flow rate is 685 litres per second (HHQ: 14, 0 mü/s on 12 August 2002 and NNQ: 80 l/s on 27 September 1942) . (1) The construction costs totalled 7, 186, 697.43 Reichsmark and exceeded the estimate by 79%. The tunnel has two mouth holes
SuperStock offers millions of photos, videos, and stock assets to creatives around the world. This image of Rothschönberg, Röschenmundloch The Rothschönberger Stolln is a water solution tunnel of the Brander and Freiberg mining district. It was excavated from 1844 to 1882 and has a total length of 50.9 km with its ancillary facilities and is equipped with 8 light holes. The average gradient is 0.63 %. The clear width is 2.50 m, the clear height in the lower tunnel section (between Rothschönberg and the VII light hole) is 3.00 m and 1.50 m above the VII light hole. This means that the tunnel can be navigated by boat for inspection and maintenance purposes. The mouth, which allows the water to flow into the Triebisch, is located in the municipality of Klipphausen near the districts of Rothschönberg, Burkhardswalde and Munzig in the district of Meißen. The water flow rate is 685 litres per second (HHQ: 14, 0 mü/s on 12 August 2002 and NNQ: 80 l/s on 27 September 1942) . (1) The construction costs totalled 7, 186, 697.43 Reichsmark and exceeded the estimate by 79%. The tunnel has two mouth holes by Sylvio Dittrich/imageBROKER is available for licensing today.
Looking for a license?
Click here, and we'll help you find it! Questions? Just ask!
Click here, and we'll help you find it! Questions? Just ask!
DETAILS
Image Number: 1848-60291419Rights ManagedCredit Line:Sylvio Dittrich/imageBROKER/SuperStockCollection:imageBROKER Contributor:Sylvio Dittrich Model Release:NoProperty Release:NoResolution:3744×5616
