Model or a Mastery Sheer. Model of a mast crane, a mast lifting, on base plank. The legs lean forward and are retained by two crowds and four stains of bolders confirmed. The foot in which the crowds are adjustable in three positions. Behind the bollards are two capstan and two beting. There is a major predict between the paws of the mast crane. Two hoists, one for the top and one for the lower part of the mast: the rope is attached to the top of the mast crane and is hence through the double block that is attached to the mast and a three-disc block at the top of the mast crane, Then to a block to the beting, back to the three-disc block at the top and down again. There are two blocks at the top of the mast. Sports for climbing are arranged at the back of the paws of the crane.

Model or a Mastery Sheer. Model of a mast crane, a mast lifting, on base plank. The legs lean forward and are retained by two crowds and four stains of bolders confirmed. The foot in which the crowds are adjustable in three positions. Behind the bollards are two capstan and two beting. There is a major predict between the paws of the mast crane. Two hoists, one for the top and one for the lower part of the mast: the rope is attached to the top of the mast crane and is hence through the double block that is attached to the mast and a three-disc block at the top of the mast crane, Then to a block to the beting, back to the three-disc block at the top and down again. There are two blocks at the top of the mast. Sports for climbing are arranged at the back of the paws of the crane.
SuperStock offers millions of photos, videos, and stock assets to creatives around the world. This image of Model or a Mastery Sheer. Model of a mast crane, a mast lifting, on base plank. The legs lean forward and are retained by two crowds and four stains of bolders confirmed. The foot in which the crowds are adjustable in three positions. Behind the bollards are two capstan and two beting. There is a major predict between the paws of the mast crane. Two hoists, one for the top and one for the lower part of the mast: the rope is attached to the top of the mast crane and is hence through the double block that is attached to the mast and a three-disc block at the top of the mast crane, Then to a block to the beting, back to the three-disc block at the top and down again. There are two blocks at the top of the mast. Sports for climbing are arranged at the back of the paws of the crane. by Piemags/PL Photography Limited is available for licensing today.
Royalty Free License
Royalty-Free Standard Commercial licenses are granted for worldwide, non-exclusive and perpetual use, unless specifically noted otherwise. All Royalty-Free transactions are final. The Royalty-Free Standard Commercial license has no limitations and covers up to 15 users.
  • $50.00 Low500 X 358
  • $150.00 Med750 X 537
  • $250.00 High2500 X 1791
  • Download your images from the download tab on this page after purchase.
  • Up to 5 downloads
  • Can be used for a year after purchase.
$1,225.00
RF High / Super Res 5 Pack
Save $25.00
$245.00
per download
Order a Framed Print
Looking for a license?
Click here, and we'll help you find it! Questions? Just ask!
DETAILS
Image Number: 6145-45817002Royalty FreeCredit Line:Piemags/PL Photography Limited/SuperStockCollection:PL Photography LimitedStory:Model Cannons and ClocksContributor:PiemagsModel Release:NoProperty Release:NoResolution:2500×1791