Jeremy Clevenger, a carpenter, drills holes to prepare a concrete form to finish off tie backs that hold a wall in place during a project run by the U.S. Army Corps of Engineers Pittsburgh District at the Locks and Dam 4 near Charleroi on the Monongahela River in Belle Vernon, Pennsylvania, April 5, 2022. As the excavation and demolition phase nears completion, the project has transitioned to construction, which includes prepping the miter sill for concrete placement, running electrical, finishing the foundation for the bulkhead sill, pouring concrete, anchoring the river wall and more. The Charleroi project began in 2004. The federal government funds half of the projects cost, while the other half is covered by navigation industry through taxes paid on diesel fuel.

Jeremy Clevenger, a carpenter, drills holes to prepare a concrete form to finish off tie backs that hold a wall in place during a project run by the U.S. Army Corps of Engineers Pittsburgh District at the Locks and Dam 4 near Charleroi on the Monongahela River in Belle Vernon, Pennsylvania, April 5, 2022. As the excavation and demolition phase nears completion, the project has transitioned to construction, which includes prepping the miter sill for concrete placement, running electrical, finishing the foundation for the bulkhead sill, pouring concrete, anchoring the river wall and more. The Charleroi project began in 2004. The federal government funds half of the projects cost, while the other half is covered by navigation industry through taxes paid on diesel fuel.
SuperStock offers millions of photos, videos, and stock assets to creatives around the world. This image of Jeremy Clevenger, a carpenter, drills holes to prepare a concrete form to finish off tie backs that hold a wall in place during a project run by the U.S. Army Corps of Engineers Pittsburgh District at the Locks and Dam 4 near Charleroi on the Monongahela River in Belle Vernon, Pennsylvania, April 5, 2022. As the excavation and demolition phase nears completion, the project has transitioned to construction, which includes prepping the miter sill for concrete placement, running electrical, finishing the foundation for the bulkhead sill, pouring concrete, anchoring the river wall and more. The Charleroi project began in 2004. The federal government funds half of the projects cost, while the other half is covered by navigation industry through taxes paid on diesel fuel. by piemags/PL Photography Limited is available for licensing today.
Royalty Free License
Royalty-Free Standard Commercial licenses are granted for worldwide, non-exclusive and perpetual use, unless specifically noted otherwise. All Royalty-Free transactions are final. The Royalty-Free Standard Commercial license has no limitations and covers up to 15 users.
  • $50.00 Low500 X 333
  • $150.00 Med750 X 499
  • $250.00 High6048 X 4024
  • Download your images from the download tab on this page after purchase.
  • Up to 5 downloads
  • Can be used for a year after purchase.
$1,225.00
RF High / Super Res 5 Pack
Save $25.00
$245.00
per download
Order a Framed Print
Looking for a license?
Click here, and we'll help you find it! Questions? Just ask!
DETAILS
Image Number: 6145-54117230Royalty FreeCredit Line:piemags/PL Photography Limited/SuperStockCollection:PL Photography LimitedContributor:piemagsModel Release:NoProperty Release:NoResolution:6048×4024