During a training exercise on Sept. 11, 2020, inside the Vehicle Assembly (VAB) at NASAs Kennedy Space Center in Florida, a technician with the agencys Exploration Ground Systems verifies a mock-up of the Space Launch System (SLS) aft booster segment, referred to as a pathfinder, was placed on the mobile launcher correctly. The rehearsal involved teams preparing the aft pathfinder segment in High Bay 4 of the VAB, lifting and moving it over to High Bay 3, and lowering it onto the mobile launcher in preparation for Artemis I. Stacking of the actual booster segments will occur later this year, before the SLS core stage arrives at the Florida spaceport. Artemis I is the first in a series of increasingly complex missions that will test SLS and the Orion spacecraft as an integrated system prior to crewed flights to the Moon.

During a training exercise on Sept. 11, 2020, inside the Vehicle Assembly (VAB) at NASAs Kennedy Space Center in Florida, a technician with the agencys Exploration Ground Systems verifies a mock-up of the Space Launch System (SLS) aft booster segment, referred to as a pathfinder, was placed on the mobile launcher correctly. The rehearsal involved teams preparing the aft pathfinder segment in High Bay 4 of the VAB, lifting and moving it over to High Bay 3, and lowering it onto the mobile launcher in preparation for Artemis I. Stacking of the actual booster segments will occur later this year, before the SLS core stage arrives at the Florida spaceport. Artemis I is the first in a series of increasingly complex missions that will test SLS and the Orion spacecraft as an integrated system prior to crewed flights to the Moon.
SuperStock offers millions of photos, videos, and stock assets to creatives around the world. This image of During a training exercise on Sept. 11, 2020, inside the Vehicle Assembly (VAB) at NASAs Kennedy Space Center in Florida, a technician with the agencys Exploration Ground Systems verifies a mock-up of the Space Launch System (SLS) aft booster segment, referred to as a pathfinder, was placed on the mobile launcher correctly. The rehearsal involved teams preparing the aft pathfinder segment in High Bay 4 of the VAB, lifting and moving it over to High Bay 3, and lowering it onto the mobile launcher in preparation for Artemis I. Stacking of the actual booster segments will occur later this year, before the SLS core stage arrives at the Florida spaceport. Artemis I is the first in a series of increasingly complex missions that will test SLS and the Orion spacecraft as an integrated system prior to crewed flights to the Moon. by Piemags/PL Photography Limited is available for licensing today.
Image - Royalty Free Editorial
Royalty-Free Standard Editorial licenses are granted for worldwide, non-exclusive and perpetual NON-COMMERCIAL uses, unless specifically noted otherwise. All Royalty-Free transactions are final. The Royalty-Free Standard Editorial license has no limitations and covers up to 15 users.
  • $50.00 Low500 X 333
  • $150.00 Med750 X 500
  • $250.00 High6720 X 4480
Order a Framed Print
Looking for a license?
Click here, and we'll help you find it! Questions? Just ask!
DETAILS
Image Number: 6145-45280695Royalty FreeCredit Line:Piemags/PL Photography Limited/SuperStockCollection:PL Photography LimitedContributor:PiemagsModel Release:NoProperty Release:NoResolution:6720×4480
|
|
|
|