CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour, the last orbiter to join the shuttle fleet, begins rolling off Launch Pad 39B for the 3.4-mile rollaround to Launch Pad 39A. First motion was at 3:16 a.m. EDT. Endeavour was on standby on Pad 39B to be used in the unlikely event that a rescue mission was necessary during space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The payload on the STS-127 mission includes the Japan Aerospace Exploration Agency's Kibo Exposed Facility and the Experiment Logistics Module Exposed Section of the International Space Station. They will be installed on the Kibo laboratory already on the station. Launch of STS-127 is targeted for June 13.

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour, the last orbiter to join the shuttle fleet, begins rolling off Launch Pad 39B for the 3.4-mile rollaround to Launch Pad 39A. First motion was at 3:16 a.m. EDT.  Endeavour was on standby on Pad 39B to be used in the unlikely event that a rescue mission was necessary during space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The payload on the STS-127 mission includes the Japan Aerospace Exploration Agency's Kibo Exposed Facility and the Experiment Logistics Module Exposed Section of the International Space Station. They will be installed on the Kibo laboratory already on the station. Launch of STS-127 is targeted for June 13.
SuperStock offers millions of photos, videos, and stock assets to creatives around the world. This image of CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour, the last orbiter to join the shuttle fleet, begins rolling off Launch Pad 39B for the 3.4-mile rollaround to Launch Pad 39A. First motion was at 3:16 a.m. EDT. Endeavour was on standby on Pad 39B to be used in the unlikely event that a rescue mission was necessary during space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The payload on the STS-127 mission includes the Japan Aerospace Exploration Agency's Kibo Exposed Facility and the Experiment Logistics Module Exposed Section of the International Space Station. They will be installed on the Kibo laboratory already on the station. Launch of STS-127 is targeted for June 13. by Piemags/PL Photography Limited is available for licensing today.
Image - Royalty Free Editorial
Royalty-Free Standard Editorial licenses are granted for worldwide, non-exclusive and perpetual NON-COMMERCIAL uses, unless specifically noted otherwise. All Royalty-Free transactions are final. The Royalty-Free Standard Editorial license has no limitations and covers up to 15 users.
  • $50.00 Low335 X 500
  • $150.00 Med502 X 750
  • $250.00 High2008 X 3000
Order a Framed Print
Looking for a license?
Click here, and we'll help you find it! Questions? Just ask!
DETAILS
Image Number: 6145-44765350Royalty FreeCredit Line:Piemags/PL Photography Limited/SuperStockCollection:PL Photography LimitedStory:Space Shuttle LaunchContributor:PiemagsModel Release:NoProperty Release:NoResolution:2008×3000